This project proposes to modify existing conveyance systems within the CID boundary to supply water for recharge as well as storage. The goal is to have the capacity to divert water around the CID, to areas where the water can be used for On-Farm Flood Capture, Aquifer Storage and Recovery, Above Ground Storage as well as irrigation when water is available, and groundwater recharge. This project will increase the volume of water that can be captured and utilized within CID boundaries.
A direct benefit of the groundwater levels in the upper aquifer will be within the first year of use. The benefit to the lower aquifer will in the following years through downward leakage and surface water use rather than pumping groundwater.
Start time will be as soon as funds are available. The project is estimated to be completed within 3 years of funding. The benefits will accrue after completion of the project and within the first year of use.